Project Overview
The extensive project at Gemini Taunton began with the careful dismantling of their existing Todd Engineering spray booth, a critical step requiring precision and efficiency to ensure minimal operational downtime. Recognising the importance of uninterrupted service for Gemini, we strategically installed a temporary Olympian spray booth. This interim solution allowed Gemini Taunton to maintain continuous workflow, ensuring business as usual during the transitional phase.
State-of-the-Art Installation
With the temporary facility fully operational, our dedicated team moved forward with the installation of the advanced, eco-friendly Zeus all-electric spray booth. This innovative booth features:
-
Side-loading Roller Shutter Door: Enhancing operational flexibility and vehicle accessibility.
-
Track and Skate System: Providing seamless vehicle movement from preparation to the refinishing stages, significantly improving workflow and productivity.
-
Dedicated Paint Mixing Room: Positioned strategically adjacent to the spray booth for optimal workflow and efficiency, reducing downtime and enhancing the speed and quality of the refinishing process.
Sustainability Commitment
In alignment with the growing industry shift toward carbon neutrality, Gemini Taunton has taken a decisive step by adopting the Zeus all-electric spray booth. This forward-thinking choice supports their mission to reduce carbon emissions and improve energy efficiency, with the ultimate aim of reaching net-zero operations in the future. The Zeus booth uses far infrared (FIR) technology to cure paint at a molecular level, dramatically lowering energy consumption and eliminating the need for fossil fuels in the refinishing process.
Client Testimonial
Stuart, General Manager at Gemini Taunton, praised the project execution and collaboration:
"Everything went and was fine yesterday, thank you. I would like to commend every one of you involved in the installation of our new oven. From your good self to the guys who have been working so hard to complete the install. Please pass on my thanks!"
Commitment to Excellence
This successful collaboration with Gemini Taunton underscores Todd Engineering's unwavering commitment to providing tailored, efficient, and sustainable solutions. Our comprehensive approach—from initial consultation, planning, and installation to commissioning and post-installation support—ensures our clients receive the highest standard of service and support at every stage.
We extend our sincere gratitude to Gemini Taunton for their continued partnership and trust, and we look forward to supporting their future growth and success.