Worthing Fast-Track Facility Completed for AD Williams Group

Todd Engineering has recently completed a new fast-track repair facility in Worthing for the AD Williams Group, this state-of-the-art facility comprised of six smart repair preparation booths and two full downdraught Spartan 2000 Series spraybooths with low profile floors. Vehicle movements are aided with the use of a side loading track and skate system which runs through the entire length of the installation. This new facility is the latest addition to the AD Williams group of BSI accredited bodyshops and continues their commitment on equipping their state-of-the-art bodyshops with the latest in accident repair technology.
The spraybooths include LED Lighting and inverter variable speed drives as standard and have also been outfitted with Todd Engineering’s Hydracure water based curing system to achieve faster curing times.

Posted in Uncategorised

Leave a Reply

Your email address will not be published. Required fields are marked *

*

Todd Engineering