Sturgess of Leicester Installation Nearing Completion

Todd Engineering were invited to quote this prestigious project for the Stugess Motor Group back in 2016,  we are proud to have been selected to undertake this contract to provide a full turnkey solution for the fitting out of their brand new state-of-the-art PDI Centre.  This installation includes two Poseidon 4000 Series spraybooths with full downdraught floors excavated into the ground which feature space saving roof mounted plant, LED Lighting, Eco+ Energy Save Mode, Cabin Auto-Pressurization Management System, Touch Screen Control Panels and built-in spraybooth vehicle lifts.  Alongside the two main spraybooths we have also installed aluminium repair bays, preparation bays, Paint mixing room and storage areas.  Through our close working relationships with other market leading brands we have outfitted the bodyshop with Minden Centralised dust extraction and Todd Engineering took care of all service connections, compressed air ring mains, supply of ABAC compressor and even the installation of Calor LPG tanks to supply the facility.

Posted in Uncategorised

Leave a Reply

Your email address will not be published. Required fields are marked *

*

Todd Engineering