More installations including Greentech technology coming soon!

In partnership with (2)

Todd engineering are pleased to have been chosen as the Spraybooth supplier for Fix Auto Penzance. The award winning bodyshop is continuing to expand, including a redesign of the current site. This redesign will feature a spectacular 3-bay spraybooth with integrated E5 Greentech gas catalytic Arch.  The combination of top of the line 3 bay spraybooth and the latest drying technology will optimise their work flow, to help keep up with the growing work load.

E5 - edited

Todd Engineering has also been appointed to install Greentech technology at a second Fix Auto site, the impressive E9 along with the Hercules booth containing the E6, will be installed for Dai Sims at Fix Auto Tonypandy.

The E9 is suited to light commercial vehicles and includes power assisted positioning of the panels, making it suitable for a larger range of vehicles. The E9 has everything needed to increase productivity by up to 50% and will also reduce their energy consumption by up to 80%. The Hercules is a tried and tested new product from Todd engineering, that combines the high performance and quality of top of the range booths, with the very latest in IR Gas Catalytic drying technology.  The ultra-fast curing times associated with using this technology presents bodyshops with higher throughput, efficiency and more substantial energy savings compared to conventional curing technologies.

E9 copy copy

Posted in Uncategorised

Leave a Reply

Your email address will not be published. Required fields are marked *

*

Todd Engineering